Show simple item record

dc.contributor.authorToshmamat Doniyorov
dc.contributor.authorUlugbek Kuvatov
dc.contributor.authorAsror Umirov
dc.contributor.authorAkbar Abdurazzokov
dc.date.accessioned2025-10-02T08:10:23Z
dc.date.available2025-10-02T08:10:23Z
dc.date.issued2025
dc.identifier.urihttps://dspace.kstu.uz/xmlui/handle/123456789/354
dc.description.abstractInformation is provided on the work carried out in the Republic of Uzbekistan for the development and transformation of energy infrastructure. A diagram of the proposed Talimarjan hydropower complex is proposed, consisting of a cascade of pumping stations, a reservoir, thermal electric, photovoltaic and hydroelectric stations, which is a decentralized hybrid energy system connected to a centralized energy system. A method for determining the operating mode of the parameters of a hybrid power system on a daily load schedule is presented. The results of calculations to determine the efficiency of the proposed energy system, obtained due to the difference in the cost of electricity compared to a centralized energy system and the reduction of carbon dioxide emissions, are presented.en_US
dc.language.isoenen_US
dc.subjectphotovoltaic power plants, hydro power plants, decentralized energy system, cascade of pumping stations, daily load schedule.en_US
dc.titleHybrid Power Supply System for Pumping Stations Based on Thermal, Photovoltaic and Hydroelectric Stationsen_US
dc.typeArticleen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record